So we have moved the air compressor into the new shop, wired it and started piping it. Wired the air dryer. We have finally got the warping out of the water table...
[ATTACH=CONFIG]144[/ATTACH][ATTACH=CONFIG]145[/ATTACH]
Matt,
Here are the close ups of the gantry & stepper motors. Does everything look like we put it together correctly?
[ATTACH=CONFIG]146[/ATTACH][ATTACH=CONFIG]147[/ATTACH][ATTACH=CONFIG]148[/ATTACH][ATTACH=CONFIG]149[/ATTACH][ATTACH=CONFIG]150[/ATTACH][ATTACH=CONFIG]151[/ATTACH]